Date: Friday, June 14 – Saturday, June 15, 2019
Start Time: 9:00 PM
End Time: 12:00 AM
Duration: 3 hours
On Friday, June 14th beginning at 9pm, ISC will be performing power transitions in the 3401 Walnut Street wiring closets to ensure that power to network electronics will not be disrupted during the upcoming data center UPS removal. Between 9pm Friday and 12am on Saturday there may be a 15 minute disruption per wiring closet as the network electronics are migrated to the building’s power if required.
If you experience any problems beyond the planned maintenance window, please contact ISC Client Care at 215-898-1000 and follow the after-hour prompts, if necessary.