Planned: Scheduled Power Outage Myrin Building on February 17, 2018

Date: Saturday, February 17, 2018 

Start Time: 6:00 AM

Duration: 9 hours (until 3pm)

Buildings Affected: Myrin Building

Services Affected: All powered equipment will have no power during this outage window unless it is on a generator based outlet. We do not expect the outage to last longer than the anticipated time frame. Network Connectivity should remain active as it is on generator back up. All other telephones will operate normally.

Description: Electrical work needs to be completed in the mechanical room to install new panels for the generator project. Wiring and other tie ins will be completed during this outage. A power outage is required to complete this work in a safe manner. The contractor will also be testing the new whole building generator during this outage to ensure functionality. The outage is not expected to last longer than the anticipated time frame. Please power down any non-essential equipment to prevent damage to computers and other electronic equipment due to the power interruption.